Cefneithin

Cefneithin

The site comprises an infill within an existing community. In urban design terms,
the aim of this 41 unit scheme was to link two disparate parts of the same community. In this respect, the design and routing of the pedestrian routes through and within the site, particularly in relation to vehicular flow, was paramount. Approximate contract value £5.0m.

 

Case Studies